What the sources establish
- The City reported the roof entered use on 15 January 2026.
- It has 332 PVT panels and 556 square metres of planting.
- Generated heat is supplied to a Dutch WKO system—underground seasonal heat-and-cold storage—for later use.
- The green roof adds 4.65 cubic metres of rain-buffer capacity.
- The City states a target of 119 MWh per year and an estimated benefit of about sixty tonnes of carbon dioxide per year.
Evidence limits
Annual energy and carbon figures are targets or estimates, not measured performance. Future connections to neighbouring buildings are omitted.
Sources
- 1Gemeente EindhovenEnergy roof enters use (opens externally)
- 2Gemeente EindhovenEarlier roof design (opens externally)